BCUC
IRO-006-5
Reliability Coordination - Transmission Loading Relief (TLR)
Applicability Summary
BCUC British Columbia reliability standard adoption/status record for IRO-006-5: Reliability Coordination - Transmission Loading Relief (TLR).
Notes
Extracted from WECC Approved BC Standards table. WECC source effective date: 2013-04-15. WECC hosts the public table for BC reliability adoption/status records; BCUC is the British Columbia adoption authority. The underlying standard-making body is generally NERC or WECC.