BCUC
FAC-011-4
System Operating Limits Methodology for the Operations Horizon
Applicability Summary
BCUC Mandatory Reliability Standards implementation document: System Operating Limits Methodology for the Operations Horizon.
Notes
Extracted from WECC Approved BC Standards table. WECC source effective date: 2025-10-01. WECC hosts the public table for BC reliability adoption/status records; BCUC is the British Columbia adoption authority. The underlying standard-making body is generally NERC or WECC.