BC Hydro
Information Bulletin 2023-029 R1
Information Bulletin 2023-029 R1 - Limited Release of Single-Phase Secondary 320A 120/240V Services with Self-Contained Metering
Applicability Summary
BC Hydro record for Information Bulletin 2023-029 R1 - Limited Release of Single-Phase Secondary 320A 120/240V Services with Self-Contained Metering.
Notes
Extracted from official BC Hydro Distribution Technical Standards and Guides source page.